BARRIE & SIMCOE COUNTY
Deck Builders & Outdoor Structure Installations in Barrie
Barrie is the largest city in our territory and one of the fastest growing in Ontario. That growth brings a client base that expects more than a basic pressure-treated deck — and a building department that requires proper drawings, engineered connections, and full permit packages before they’ll issue approval.
I’ve been designing and building decks, pergolas, and outdoor structures in Barrie since the 1990s. I know the LSRCA regulated area maps and which Barrie properties require a conservation authority permit on top of the city building permit. I know what the City of Barrie building department needs in a drawing set to move through review without revision requests.
Barrie properties range from established neighbourhoods in the south end to new builds in Innishore, Midhurst, and Springwater Township. Waterfront properties on Kempenfelt Bay and Lake Simcoe carry additional setback requirements. We’ve built on all of it.
My design standard is the same in Barrie as everywhere else we work — 50-year commercial-grade durability. The drawings, the fastener schedules, the material specifications. Built once, built right.
Decks in Barrie
Custom cedar and composite decks for Barrie properties. Engineered for Kempenfelt Bay’s freeze-thaw cycles, extreme snow load and moisture environment.
Pergolas in Barrie
Freestanding and attached pergolas. Cedar, Douglas fir, and treated lumber options. Engineered for Georgian Bay wind exposure.
Fences in Barrie
Cedar privacy and decorative fencing. Permit-compliant designs for all Barrie lot types including waterfront, corner lots, and shoreline properties.
Cabanas in Barrie
Pool cabanas and outdoor room structures. Designed for year-round use in Kempenfelt Bay’s climate. Full electrical and plumbing rough-in available.
Trelliswork & Arbors in Barrie
Garden trellises, entry arbors, and privacy screens. Designed to complement your existing architecture and landscape.
Design & Plans Only
Full architectural drawings and permit-ready plans for owner-builders and contractors. Available across Ontario and the US via DesignYourReno.com.
LOCAL KNOWLEDGE, NOT A SALES PITCH
30 Years Building on Lake Simcoe
Barrie has specific build conditions that matter. Here is what we account for on every project in this area.
LSRCA Regulated Areas
Barrie is covered in chunks by the Lake Simcoe Region Conservation Authority. Unlike a simple waterfront setback rule, LSRCA jurisdiction in Barrie is site-specific — flood-prone areas, wetlands, and shoreline properties each carry different requirements. Before we design anything in Barrie, we check the LSRCA regulated area map for your specific lot. Surprises at the permit stage cost time and money.
City of Barrie Permit Requirements
Barrie runs a full building department with engineers on staff. They review structural connections, ledger attachments, footing sizes, and load calculations. A napkin sketch won’t pass. We produce permit-ready architectural drawings that meet City of Barrie requirements the first time through — which matters when the review queue is running 6 to 10 weeks.
Fastest Growing County in Ontario
Simcoe County’s growth rate has made Barrie one of the most active construction markets in Ontario. That also means trades are stretched and inspection timelines are longer than they used to be. We schedule projects with that reality in mind and don’t promise timelines we can’t deliver.
Kempenfelt Bay & Waterfront Properties
Properties on Kempenfelt Bay and the Lake Simcoe shoreline fall under LSRCA jurisdiction and carry shoreline setback requirements on top of city zoning rules. We know both sets of requirements and design to meet them before the permit application goes in.
Midhurst, Springwater & South Barrie
We build throughout the Barrie area including Midhurst, Springwater Township, and the south end neighbourhoods. New builds in these areas often have restrictive lot coverage limits and side yard setbacks that affect deck and pergola sizing. We account for those constraints and extreme snow load in the design phase, not after the permit comes back with conditions.
Commercial-Grade, Residential Project
The same engineering standards I apply to a commercial structure go into every residential deck or pergola in Barrie. Proper joist crown orientation. Ledger connections engineered for load path and bearing. Flashing systems that keep water away from structural members. These details extend deck life from 15 years to 30 or more.
RECENT WORK
Projects in Barrie & Simcoe County
COMMON QUESTIONS
Barrie & Simcoe County Build Questions
Yes. GardenStructure.com has been designing and building pergolas in Barrie and Simcoe County since the 1990s. We handle design, permit drawings, and construction. Our pergolas are built to commercial-grade standards with 50-year longevity as the design target.
It depends on your lot. The Lake Simcoe Region Conservation Authority has jurisdiction over regulated areas throughout Barrie — flood plains, wetlands, and shoreline properties. Some lots require both a City of Barrie building permit and an LSRCA permit. We check the regulated area map before starting any design work so you know what’s required upfront.
The City of Barrie building department is thorough and the review queue reflects that. A straightforward deck permit typically takes 6 to 12 weeks. More complex structures with engineering requirements can take longer. Having complete, properly prepared drawings submitted the first time is the best way to avoid revision requests that add weeks to that timeline.
Barrie gets hard winters. Frost depth reaches 1.2m to 1.5m in Simcoe County. For decking surfaces, composite performs well against freeze-thaw cycling and reduces long-term maintenance. For structure, properly treated ACQ lumber or Western Red Cedar with hot-dipped galvanized or stainless fasteners. We spec materials for longevity, not for the lowest initial price.
It depends on project complexity. A straightforward pergola typically takes 3-5 days on site once materials are delivered. A larger deck with multiple levels might take 2-3 weeks. The permit process in Wasaga Beach typically adds 2-12 weeks to the overall timeline. Contact us in late winter or early spring to secure your summer build date.
Yes. We build throughout the greater Barrie area including Midhurst, Springwater Township, Innisfil, Bradford West Gwillimbury, and Angus. Call (705) 717-2970 to discuss your specific location.We also have crews in Muskoka and the GTA.
We prepare the permit drawings — everything the City of Barrie building department needs to issue approval. Submitting the application and managing the back-and-forth with the municipality is the owner’s responsibility. Having professional drawings prepared correctly the first time is the best way to avoid revision requests that add weeks to the timeline.
GardenStructure.com
3835 Crossland Road
Elmvale, ON L0L 1P0
(705) 717-2970 Simcoe County & Georgian Bay
(416) 951-9998 Toronto & GTA
info@gardenstructure.com
Monday to Friday: 8am to 6pm
Saturday: By appointment
Free phone consultations available · Barrie, Simcoe County & Georgian Bay